§ 50.03. Connection permits—Fee.
A.
No connection with any main or branch sewer shall be made except at a regular connection or junction built in the sewer, unless under a special permit therefor from the Director of Public Service, and no connection or repair whatever shall be made except under a permit issued by the Director. For such permits the following charges shall be made:
New Construction Permit Fee One- and two-family dwellings $125 All others 300 Repairs One- and two-family dwellings 50 All others 150 Reinspection All uses 50 B.
Such charges shall not be made in any case to persons whose property has been assessed according to law for the construction of the sewer to be tapped. Penalty, see § 50.99.
(Ord. 668-2004)