§ 98.20. Construction and repair.  


Latest version.
  • A.

    All sidewalks within the corporate limits of the City shall be constructed or repaired in accordance with the plans and specifications prepared by the Director of Public Service and to his satisfaction and approval.

    B.

    1.

    Any person performing work under this section and within any right-of-way shall be required to obtain all necessary permits except that work performed by the City as authorized by the Director of Public Service and administered by the Bureau of Engineering shall not require permits.

    2.

    Any developer or any person providing subcontract work for any developer under this section and within the right-of-way of a subdivision which has been approved by law and for which the required bond has been posted with the Bureau of Engineering must obtain the necessary permits, but shall not be required to pay for permits obtained during a period of twenty-four months following the approval date of the subdivision plans by the Council of the city.

    3.

    All work under this section shall be in accordance with the City Bureau of Engineering construction and material specifications and standard drawings.

(Ord. 272-1992)