§ 98.22. Permit required—Exemptions.  


Latest version.
  • A.

    Any person constructing a sidewalk within the corporate limits of the City shall secure a permit from the Director of Public Service. A permit shall be issued only after payment of the required permit fee(s) as established by the Director of Public Service. Such fee(s) shall be commensurate with the cost of administering the permits, performing inspections and other related services.

    B.

    1. Any person performing work under this section and within any right-of-way shall be required to obtain all necessary permits except that work performed by the City as authorized by the Director of Public Service and administered by the Bureau of Engineering shall not require permits.

    2.

    Any developer or any person providing subcontract work for any developer under this section and within the right-of-way of a subdivision which has been approved by law and for which the required bond has been posted with the Bureau of Engineering must obtain the necessary permits, but shall not be required to pay for permits obtained during a period of twenty-four months following the approval date of the subdivision plans by the Council of the city.

    3.

    All work under this section shall be in accordance with the City Bureau of Engineering construction and material specifications and standard drawings.

(Ord. 272-1992)